Cleveland 101466 Convection Steamer Probe Extension Set 2-Piece
Specifications:
| Attribute | Details |
|---|---|
| Probe Extension Set | |
| 1 @ 3 1/8" Long, 1 @ 4 5/8" Long | |
| Cleveland | |
| Boiler 36-Cgm-200, 36-Cgm-300 & Other 2 Probe Type Units. |
Description
More Information:
- CLEVELAND:101466
Step1: Power off and unplug the convection steamer; allow unit to cool completely before servicing.
Step2: Remove the control access panel carefully using proper tools.
Step3: Locate the existing probe connector inside the steamer cabinet.
Step4: Connect the extension set firmly to the probe harness.
Step5: Route wiring away from heat sources and moving parts.
Step6: Reinstall panel and secure all fasteners.
Step7: Restore power and verify proper operation.
Customer Reviews
No reviews yet. Be the first to write one!
Write a Review
-
What maintenance is required for the Cleveland 101466 Probe Extension Set?
Check the convection steamer extension set for moisture buildup or mineral deposits from steam exposure. Wipe components dry after use and inspect connectors for corrosion. Ensure connections are tight and properly aligned. Disconnect equipment before handling to reduce risk of electrical issues.
-
What are common issues with the Cleveland 101466 Probe Extension Set?
- Signal interruption caused by loose or corroded connections.
- Reduced performance from moisture intrusion.
- Inaccurate readings due to connection instability.
- Physical wear or damage to extension components.